Development portfolio · Contract negotiations

Giresun: pump rehabilitation and central monitoring proposal

A rehabilitation and central monitoring proposal prepared for Giresun Municipality’s pump systems. Measurement and feasibility are complete and contract negotiations are ongoing; this page does not present a completed project or a verified savings result.

Illustrative image: a water pumping building, reservoir and blue pipework on a hillside on the Black Sea coast

What stage is the work at?

Giresun is part of Solid Electron’s project development portfolio. We report the stages exactly as they stand.

  1. 01

    Measurement: complete

    The operating conditions of the pumps and motors, energy consumption, flow, pressure, operating points and system losses were measured.

  2. 02

    Feasibility: complete

    The savings potential, the scope of rehabilitation and the investment model were defined.

  3. 03

    Contract: negotiations ongoing

    The proposal is being discussed with the municipality; no commissioning date or verified project result is given on this page.

Proposed scope

The proposal covers pump rehabilitation, variable-frequency drives (VFDs), Metirius field control, central network monitoring and long-term performance management. The details of the scope and the investment model will be set by the outcome of the contract negotiations.

Project status in the documents

In the company’s project development portfolio, Giresun is recorded as a study with measurement and feasibility complete and contract negotiations ongoing. For this reason, no commissioning date, operating result or energy or water savings are disclosed here. For a completed, measured result, see the Niğde project.

The photo on this page is illustrative and does not show a specific facility in Giresun.

Let’s start with measurement for your municipality.

Let’s assess the operating points, energy consumption and system losses of your pumps and motors together.